During the last 2 years ESO has operated the “M1 Test Facility”, a test stand consisting of a representative section of the E-ELT primary mirror equipped with 4 complete prototype segment subunits including sensors, actuators and control system. The purpose of the test facility is twofold: it serves to study and get familiar with component and system aspects like calibration, alignment and handling procedures and suitable control strategies on real hardware long before the primary mirror (hereafter M1) components are commissioned. Secondly, and of major benefit to the project, it offered the possibility to evaluate component and subsystem performance and interface issues in a system context in such detail, that issues could be identified early enough to feed back into the subsystem and component specifications. This considerably reduces risk and cost of the production units and allows refocusing the project team on important issues for the follow-up of the production contracts. Experiences are presented in which areas the results of the M1 Test Facility particularly helped to improve subsystem specifications and areas, where additional tests were adopted independent of the main test facility. Presented are the key experiences of the M1 Test Facility which lead to improved specifications or identified the need for additional testing outside of the M1 Test Facility.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
M. Dimmler, J. Marrero, S. Leveque, Pablo Barriga, B. Sedghi, and N. Kornweibel "Improved E-ELT subsystem and component specifications, thanks to M1 test facility", Proc. SPIE 9145, Ground-based and Airborne Telescopes V, 91451K (22 July 2014); https://doi.org/10.1117/12.2055142
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Photoacoustic tomography

Control systems

Sensors

Interfaces

Prototyping

Actuators

Telescopes

RELATED CONTENT

On the way to build the M4 Unit for the...
Proceedings of SPIE (July 21 2014)
GMT M1 subsystem: status, design and testing
Proceedings of SPIE (July 06 2018)
Development of a test rig for the active control of...
Proceedings of SPIE (March 21 1997)
E-ELT M1 test facility
Proceedings of SPIE (September 17 2012)
Adaptive secondary mirrors for the large binocular telescope
Proceedings of SPIE (December 24 2003)

Back to Top