Paper
28 July 2010 GREGOR telescope: start of commissioning
R. Volkmer, O. von der Lühe, C. Denker, S. Solanki, H. Balthasar, T. Berkefeld, P. Caligari, M. Collados, C. Halbgewachs, F. Heidecke, A. Hofmann, M. Klvana, F. Kneer, A. Lagg, E. Popow, D. Schmidt, W. Schmidt, M. Sobotka, D. Soltau, K. Strassmeier
Author Affiliations +
Abstract
With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.
© (2010) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
R. Volkmer, O. von der Lühe, C. Denker, S. Solanki, H. Balthasar, T. Berkefeld, P. Caligari, M. Collados, C. Halbgewachs, F. Heidecke, A. Hofmann, M. Klvana, F. Kneer, A. Lagg, E. Popow, D. Schmidt, W. Schmidt, M. Sobotka, D. Soltau, and K. Strassmeier "GREGOR telescope: start of commissioning", Proc. SPIE 7733, Ground-based and Airborne Telescopes III, 77330K (28 July 2010); https://doi.org/10.1117/12.857079
Lens.org Logo
CITATIONS
Cited by 12 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Telescopes

Adaptive optics

Cooling systems

Zerodur

Polarimetry

Sun

Back to Top