The NRC Herzberg Institute of Astrophysics (NRC-HIA) is currently responsible to contribute Band 3 (84-116 GHz) receivers to the international ALMA project - a partnership involving North America, Europe and, now, Asia. Not only are the technical requirements for these receivers far more stringent than those for any existing radio astronomy receivers operating at these frequencies, but the delivery schedule for these receivers is equally challenging. Since the Asian partnership joined the ALMA project in 2006, NRC-HIA has been asked to deliver an additional 11 cartridges, for a total of 73 units. Some of these new cartridges will be used for the ALMA Compact Array (ACA) and others as spares. Moreover, the project has also requested that these additional cartridges be delivered in the same time period as the original 62 units. To meet this requirement, production must increase from the existing rate of one unit every four weeks to one every two, taxing the existing production infrastructure at NRC-HIA. Additional test facilities and human resources must be planned to sustain the required production rate over the next several years. Industrial involvement is one of the important elements in our production plan. In order to supplement the existing human resources at NRC-HIA, we are planning to outsource a number of low-risk and labor-intensive tasks to industry. However, NRC-HIA will retain overall project management responsibility and will conduct all the cartridge integration and acceptance test activities in-house. This paper focuses on the resource estimation, planning and project management required to deliver the Band 3 receivers to the ALMA project on time and on budget.
© (2008) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Keith Yeung, Stéphane Claude, and David Loop "The ALMA Band 3 (84-116 GHz) receiver production plan", Proc. SPIE 7017, Modeling, Systems Engineering, and Project Management for Astronomy III, 70171B (9 July 2008); https://doi.org/10.1117/12.788881
Lens.org Logo
CITATIONS
Cited by 4 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Receivers

Cryogenics

Amplifiers

Antennas

Double sideband modulation

Fourier transforms

Manufacturing

RELATED CONTENT

KPAF (K-band phased array feed) instrument concept
Proceedings of SPIE (July 23 2014)
High-sensitive ultra-low frequency hydrophone
Proceedings of SPIE (March 15 2019)
Calibration and testing of the Planck-LFI QM instrument
Proceedings of SPIE (July 06 2006)
Solid state detector arrays for terahertz applications
Proceedings of SPIE (May 19 2006)
ASAR airborne SAR simulator
Proceedings of SPIE (December 15 1995)
Receivers for the Millimeter Array
Proceedings of SPIE (July 31 1998)

Back to Top