Presentation + Paper
11 September 2024 GMT enclosure detail engineering design: facing the construction phase
Nerea Castro, Armando Bilbao, Alberto Fernández, Paula Sierra, Ángel Gómez, Lourdes Cabezuelo, Esther Fernández, Juan Martinez, Francisco José Sanchez, Miguel Martin, Arantza de Echenique, Rodrigo Pereira, Andres Alfredo Massa, Bruce C. Bigelow, Gustavo Arriagada, Eduardo Villar, Christopher Madden, Miroslav Vulinovic, Francisco Meza, Hector Swett
Author Affiliations +
Abstract

The GMT enclosure detail engineering design has been consolidated to confidently face the future construction phase. This final detailed design phase has focused on delivering a cost-effective reliable enclosure that can be efficiently built in Las Campanas remote location providing a resilient integrated system that will house and protect GMT telescope against adverse environmental and seismic conditions. A seamless integration of a wide variety of disciplines including concrete and steel structures, mechanisms, mechanical-electrical-plumbing (MEP), telescope specific utilities, control systems and architectural has been vital to comply with the strict requirements of the project.

Besides, a thorough validation plan has been produced comprising analytical verification, early prototypes, factory and site assembly and testing plans (FAT & SAT), to guarantee performance and reliability of all subsystems at the site. Furthermore, construction procedures, techniques and logistics have been reviewed and considered when developing design key features together with assembly specifications so that the enclosure is constructed at the site in a safe and effective manner.

Conference Presentation
(2024) Published by SPIE. Downloading of the abstract is permitted for personal use only.
Nerea Castro, Armando Bilbao, Alberto Fernández, Paula Sierra, Ángel Gómez, Lourdes Cabezuelo, Esther Fernández, Juan Martinez, Francisco José Sanchez, Miguel Martin, Arantza de Echenique, Rodrigo Pereira, Andres Alfredo Massa, Bruce C. Bigelow, Gustavo Arriagada, Eduardo Villar, Christopher Madden, Miroslav Vulinovic, Francisco Meza, and Hector Swett "GMT enclosure detail engineering design: facing the construction phase", Proc. SPIE 13094, Ground-based and Airborne Telescopes X, 1309405 (11 September 2024); https://doi.org/10.1117/12.3017791
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Design

Telescopes

Control systems

Camera shutters

Safety

Engineering

Cladding

RELATED CONTENT

INO340 enclosure design and construction
Proceedings of SPIE (August 26 2022)
Procurement of the dome and the telescope structure of the...
Proceedings of SPIE (September 11 2024)
MROI unit telescope enclosure manufacturing and tests
Proceedings of SPIE (July 06 2018)
The E-ELT project: the dome design study
Proceedings of SPIE (September 27 2012)
The E-ELT Project: the Dome design status
Proceedings of SPIE (August 11 2010)

Back to Top