Poster + Paper
29 August 2022 Tools and equipment needed for the installation, calibration and maintenance of the instruments and optics for the Colibrí Telescope in SPM Observatory
María H. Pedrayes-López, Stéphane Basa, Edgar Omar Cadena Zepeda, François Dolon, Liliana Figueroa, Johan Floriot, Elena Jiménez-Bailón, Rosalía Langarica, Eduardo López Ángeles, Erica E. Lugo-Ibarra, José L. Ochoa, Pierre Richaud, Silvio Tinoco, Alan M. Watson
Author Affiliations +
Conference Poster
Abstract
We present the design of the tools and equipment needed for mounting and dismounting the M1, M2, and M3 mirrors and DDRAGO/CAGIRE instrument of the Colibrí telescope at the observing room floor and from there to the ground level outside the building. Also, it includes the tool needed to balance the instruments that will be attach to Nasmyth stations and the ones needed to handle the mirrors in the vacuum chamber. Our designs confront the problem of handling these components in the very limited space available in the dome of a fast alt-az telescope.
© (2022) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
María H. Pedrayes-López, Stéphane Basa, Edgar Omar Cadena Zepeda, François Dolon, Liliana Figueroa, Johan Floriot, Elena Jiménez-Bailón, Rosalía Langarica, Eduardo López Ángeles, Erica E. Lugo-Ibarra, José L. Ochoa, Pierre Richaud, Silvio Tinoco, and Alan M. Watson "Tools and equipment needed for the installation, calibration and maintenance of the instruments and optics for the Colibrí Telescope in SPM Observatory", Proc. SPIE 12182, Ground-based and Airborne Telescopes IX, 1218248 (29 August 2022); https://doi.org/10.1117/12.2630646
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Mirrors

Finite element methods

Interfaces

Observatories

RELATED CONTENT


Back to Top